Marry Christmas;
Joyous Holiday Season & Happy New Year;
Warm Cheers; To Your Good Health
Saeed
A Thin Air Creation!
DIY Step By Step, Medium Format Stereo Lithographic Printer.
Configuration; Bench Style Open Structure, Interchangeable Integration.
Part-One's-Timeline, about two weeks
a- Concept.
b- Frame design.
c- Bill of material.
d- Purchasing & waiting period for the Stuff to arrive.
e- Fabrication.
f- Assemble.
Thin Air Creation
-
- Posts: 128
- Joined: Wed Jan 22, 2014 1:31 am
- Location: LOS ANGELES [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1266: count(): Parameter must be an array or an object that implements Countable
Re: Thin Air Creation
Part One- Update
Running two weeks late.
Finding the proper hardware for 25mm series extrusions is bit of a challenge, here in USA. I made the best fit by utilizing 80/20 30 series brackets by splitting into two units. the whole frame assembly is going to be completed in about two weeks.
A simple DIY jig; and a fixed plunger saw was used to make the precise cuts of extrusions.
Part-One Initial phase partially complete.
Part-Two Controller & Vat
a- Intermediate GLBL Controller & FEP Film Vat Operational.
b- Vat # 3 fabrication timeline few days.
c- Vat # 4 Construction timeline two weeks.
d- All in one; Multi touch screen controller / interface and dedicated computational hardware; Timeline eight weeks.
e- Simultaneously DLP projector light source conversion and custom additions.
Running two weeks late.
Finding the proper hardware for 25mm series extrusions is bit of a challenge, here in USA. I made the best fit by utilizing 80/20 30 series brackets by splitting into two units. the whole frame assembly is going to be completed in about two weeks.
A simple DIY jig; and a fixed plunger saw was used to make the precise cuts of extrusions.
Part-One Initial phase partially complete.
Part-Two Controller & Vat
a- Intermediate GLBL Controller & FEP Film Vat Operational.
b- Vat # 3 fabrication timeline few days.
c- Vat # 4 Construction timeline two weeks.
d- All in one; Multi touch screen controller / interface and dedicated computational hardware; Timeline eight weeks.
e- Simultaneously DLP projector light source conversion and custom additions.
-
- Posts: 128
- Joined: Wed Jan 22, 2014 1:31 am
- Location: LOS ANGELES [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1266: count(): Parameter must be an array or an object that implements Countable
Re: Thin Air Creation
Complication of Part-one, Photographs, and moving onto the integration
-
- Posts: 128
- Joined: Wed Jan 22, 2014 1:31 am
- Location: LOS ANGELES [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1266: count(): Parameter must be an array or an object that implements Countable
Re: Thin Air Creation
This is a sectional Vat, and the FEP film is sandwiched with a gasket. The structure is interchangeable, with a flex or rigid base.
- PomeroyB
- Posts: 168
- Joined: Thu Mar 27, 2014 9:51 pm [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1266: count(): Parameter must be an array or an object that implements Countable
Re: Thin Air Creation
Double the printer, double the fun! Nice work.
-
- Posts: 25
- Joined: Sun Feb 22, 2015 3:35 pm [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1266: count(): Parameter must be an array or an object that implements Countable
Re: Thin Air Creation
Beast! Looking good!